📰 Today’s Build Bulletin: Modern Craftsman Farmhouse (Plan 818035JSS)

1. Groundwork & Footprints
Headline: “Laying the Farmhouse Foundations!”
Step-by-Step:
-
Site Survey & Staking: Mark out the 103′-0″ × 72′-4″ footprint, front and back porch limits.
-
Clearing & Grading: Strip topsoil, level terrain, and install silt fences.
-
Utility Trenches: Excavate for water, sewer, electric, and gas lines—run beneath the future mud room and utility.
2. Foundations & Slab
Headline: “Rock-Solid Base Poured!”
Step-by-Step:
-
Footing Excavation: Dig trenches below frost depth for garage, great room, and bedroom wings.
-
Formwork & Reinforcement: Build wood forms; set #4 rebar per engineer’s grid.
-
Concrete Pour: Pump high-strength mix; screed and float for a smooth slab under the 24′-3″ × 33′-3″ garage and main living areas.
-
Curing Protocol: Cover slabs with plastic and mist for 5–7 days to prevent cracking.
3. Structural Framing
Headline: “Walls Rise for Five Bedrooms!”
Step-by-Step:
-
Sill Plate & Anchors: Bolt treated sill plates to concrete at 6′-o.c.
-
Wall Framing: Frame 2×6 exterior walls—define office, dining, great room, game room, and four guest bedrooms.
-
Roof Trusses: Lift prefabricated trusses; secure with metal hurricane straps above the vaulted 18′ great room.
-
Porch Beams: Install heavy timber front and back porch beams to carry the 10′ ceilings.
4. Weatherproof Envelope
Headline: “Sealed Tight for All Seasons!”
Step-by-Step:
-
Sheathing & Barrier: Apply ZIP panels or OSB with house wrap; tape seams.
-
Window & Door Rough-In: Set energy-efficient units in the great room, primary suite, and mud room.
-
Roof Deck & Underlayment: Nail plywood roof deck; roll synthetic underlayment beneath metal drip edge.
-
Shingles & Flashing: Install architectural shingles; flash all penetrations and valleys.
5. MEP Rough-Ins
Headline: “Systems Wired for Modern Living!”
Step-by-Step:
-
HVAC Layout: Hang ductwork; position furnace in the utility room, condenser pad outside.
-
Plumbing Runs: Stub PEX lines to bathrooms, kitchen island, pantry sink, and laundry.
-
Electrical Wiring: Pull circuits for recessed cans, outlets, and dedicated kitchen appliances.
-
Low-Voltage Prep: Prewire for security, audio, and smart-home controls in the entry hall and office.
6. Exterior Finishes & Stonework
Headline: “Craftsman Charm Takes Shape!”
Step-by-Step:
-
Stone Veneer Base: Mortar-set ledgestone around the front porch columns and garage skirt.
-
Board-and-Batten Siding: Install vertical siding panels on gable ends and dormers.
-
Trim & Soffits: Fit craftsman-style fascia, window casings, and porch ceiling beadboard.
-
Gutters & Downspouts: Mount seamless aluminum gutters to channel rain away from the foundation.
7. Interior Fit-Out
Headline: “From Drywall to Designer Details!”
Step-by-Step:
-
Insulation & Drywall: Spray-foam exterior walls; hang, tape, and skim gypsum board.
-
Millwork & Cabinetry: Fit kitchen cabinets, pantry shelving, mud-room lockers, and office built-ins.
-
Flooring & Paint: Lay wide-plank hardwood in main areas; tile baths and laundry; apply two-tone paint.
-
Finish Trim & Doors: Install baseboards, casing, interior doors, and coffered ceiling beams in the great room.
8. Porches & Landscaping
Headline: “Porch-Perfect Farmhouse Finale!”
Step-by-Step:
-
Front & Back Porch Decking: Lay pressure-treated decking boards and railings.
-
Outdoor Lighting: Mount sconces beside entry doors and under porch eaves.
-
Hardscape & Planting: Pave the driveway apron and add flowering shrubs along the foundation.
-
Final Punch & Walk-Through: Address any touch-ups, test all systems, and secure occupancy approval.